AM_Profile_Qatar69

Project Description

Client: Public Works Authority (Ashghal)
Location: Al Wakra
Year Completed: Not Provided
Value: $55,794,812.60

Fast-track construction of access roads to the Al Wakra Central Market, including cast in situ reinforced concrete trough approaches at both ends of an existing tunnel underpass.

The Challenges

Accelerated construction scheduling and ensuring structural integrity of tunnel underpass approaches.

The project involves the fast track construction of Access Roads to Al Wakra Central Market (DS136-P7) including the construction of cast in situ reinforced concrete trough approaches to both ends of an existing tunnel underpass.

  • General Items
  • Demolition and Site Clearance
  • Earthworks
  • Unbound Pavement Materials
  • Asphalt Works
  • Kerbs, Footways and Paved
  • Areas
  • Traffic Signs, Markings and
  • Studs
  • Street Lighting
  • Road Structure
  • Water Works
  • Electricity Works
  • Ooredoo Works
  • Road Drainage
  • Treated Sewerage Effluent