Project Description

Client: Council for Development and Reconstruction
Location: Beirut
Value: $4,124,931.23

Lowering the road level under Naher Beirut Bridge. Demolition of existing triple cell culvert and lowering the concrete leve and execution of new double cell culvert length 400lm, and all related road works.

Main Activities

  • Excavation 24,496m3.
  • Base course 6,182m3.
  • Wearing course 6,074m3.
  • Concrete 5,360m3.
  • Steel 840 Ton.
  • Carbon fiber 120lm.
  • Curbstones 6,400lm.
  • Tiling 5,500lm.
Screenshot 2025-02-23 at 12.40.35 AM

Before

Screenshot 2025-02-23 at 12.47.33 AM

After

Screenshot 2025-02-23 at 12.49.39 AM

Demolition of existing box culvert

Screenshot 2025-02-23 at 12.50.40 AM

Asphalt-milling

Screenshot 2025-02-23 at 12.51.40 AM

Concreting of boxculvert top slab