ANNAYA EHMEJ LAKLOUK ROAD

Screenshot 2025-02-23 at 8.30.54 PM

Project Description

Client: Ministry of Transportation and Public Works
Location: Jbeil Lebanon
Value: $15,388,308

This project consists of the widening of a mountainous existing road with all related rock excavation, retaining walls, bridge execution and road construction.

This project is a road length 10Km, and a width of12 lm.

The basic quantities included cement stabilization of 23,000 m3.

Bituminous base course (BNS) of 100,000m2 and the asphalt-wearing course of135,000m2.

On locations where the embankment heights exceed 10m, 3m wide berms were constructed and protected with concrete and anchors to stabilize the sloping ground.

The overpass, spanning 64.80m, is 70.80m long and 11.20m wide bridge.

The carriageway.

Excavations accounted for 800m3, concreting 810m3 and reinforcing for 135 -Ton

Sub-base, base course and two bituminous layers.

Screenshot 2025-02-23 at 8.43.58 PM
Screenshot 2025-02-23 at 8.44.52 PM

Performed Works

  • 27,000 m3 of Excavation in different type of soil.
  • Paying pavement in full with
  • Execution of storm water system including pipes and channels.
  • Execution of water supply network all over the road.
  • Execution of telephone civil works network.
  • Electrical network.
  • Execution of different height retaining walls from 2m to 13m.
  • Execution of 200 lm bridge.
  • Shot-crete and nails for slope stabilization.
  • Signs and road marking.
  • Ciment stabilization of 23,000m2

Rehabilitation Of Beirut Justice Palace

6261_1588583660_600x400

Project Description

Client: Ministry Of Public Works
Location: Beirut – Lebanon
Value: $17,700,050

The project consists of strengthening of Ministry of justice and palace of justice for seismic reason.

  • Execution of 1000 micro piles diameter 30cm under the building depth 16.5-lm the work was executed in very difficult conditions because we kept the facility operational and the basement height is 2.2m.
  • Steel construction floors area 6,000 m2.
  • Replacement of 10 old elevators with new.
  • Enlargement of existing footing in order to transfer load properly to the piles.
  • Execution of slab on grade thickness 30cm to assure well connection of all footing.
  • Execution of jackets to enlarge existing walls and columns.
  • Execution of new shear walls and columns.
  • The building was cut and separated transversally in order to execute two new expansion joints width 10cm for seismic movement.
  • Execution of a totally new fifth floor of steel structure area

All related finishing works:
– Execution of epoxy flooring for parking
– Installation of selected type of marbles for walls and columns
– Ceramic tiles for toilets
– Parquet for offices
– Painting
– False ceiling
– Electrical
– HV/AC
– Wooden doors and panels for walls
– Aluminum for door sand windows
– Plumbing
The whole project area is 60 000m2, steel quantity
is 2500-Ton and concrete quantity is 20,000m

Rehabilitation Of Saint George’s Cathedral Ehden

Screenshot 2025-02-24 at 10.53.03 PM

Project Description

Client: Lebanese Republic High Relief Committee
Location: Ehden, North Lebanon
Value: 1,021,0863

Renovation of the existing cathedral Residence covering a gross area of725m2 and construction of an annex for clergymen with 3,736m2 of gross space. The works included other civil works, trades, installation and finishing works. The work organization was dictated by site constraints (the closest section of the city center, restricted spoil disposals and transports, close vicinity of historical and cultural heritage sites. Protection of the building pit involved the use of micro-pile support system).

Replacement of the church roof and renewal of the entire building structure with waterproofing included. All assigned works were performed under the supervision of a competent National Trust Office because the church is on the list of National Ancient Monuments.

Included in the assigned works were civil works, trades, installation and finishing works for this building covering a net area of approximately 2,500m2.

  • Execution of 308 micro-piles diameter 30cm depth 13-lm inside and outside the church.
  • Connection of the piles with pre -stressed ground beams.
  • Connection among beams and walls with shear connectors.
  • Fixing of walls by installation of cables all around the church to prevent cracks widening.
  • Casting of slab on grade.
  • Reinstallation of marble tiles.
  • Execution of draining system around the church to prevent water infiltration into footings.
  • Dismantling and reinstallation of bell bridge

Halba-Qoubavat Roads And Bridges

AM_Profile_Lebanon17

Project Description

Client: Council for Development and Reconstruction
Location: Beirut, Lebanon
Value: $11,724,661.00

Stabilizing landslide-prone terrain while ensuring efficient drainage over an extended route.

Since the North side of Lebanon is a valley side of the country and the landslides appear almost invariably every winter season, especially after heavy rains, one of the major activity carried out in this project is stabilizing this hazardous portion.

Other major works comprised;

– Rehabilitation of 25Km road
– Construction of two bridges
– Realignment existing infrastructures
– New storm water drainage system
– Retaining wall gabion walls
– Reconstruction of base course layer using cold
– Sidewalks
– Street lighting,
– Pavement works
– Road marking
– Traffic safety
– Landslide / Piles

Main Activities:

■ Earthworks 92,020m3
■ Base Course 49,300m3
■ Recycled area 150,000m2
■ Asphalt works 33,125m3
■ Concrete works 12,953m3

Bchenata Sawaki Road

AM_Profile_Lebanon13

Project Description

Client: Ministry Of Public Work
Location: Zgharta North Lebanon
Value: $5,825,874.67

The works for the Road include the construction of 9.9Km length of two way mountainous road.

The roadways section consists of 7.0m wide pavement with 0.25m verge from each side and 1.00m wide Channel on cut side, a single face New Jersey Barrier on the fill side.

The road passes by the villages of Behwaita, Bchenata and Sawaki.

Main activities

  • Sub-base and base course layers (32000 m3).
  • Two Asphalt Pavement layer (19200Ton). Construction of approximately 1000m length of retaining walls, 13 Culvert, 6200-lm of concrete ditches for Storm water drainage network (in total: 8974m3 of reinforced concrete with 744-Ton of steel reinforcement).
  • Road accessories: 3500-lm of New Jersey Barrier, traffic signing and road marking.
  • Site and geotechnical investigation (existing utilities, boreholes at retaining walls locations.
  • Earthworks (200847m3) for road construction, road widening, drainage channels, culverts, walls.

Mdeirej Highway Reinstatement

Screenshot 2025-02-24 at 12.45.54 AM

Project Description

Client: Council Of Development And Reconstruction
Location: Saoufar
Value: $4,653,412.75

Mdeirej highway reinstatement works for the highway and grand hotel viaduct damaged by July 2006 war

  • The highway is dual carriage way 3 lanes eac.
  • Each 21 m wide.
  • Excavation. Milling 85,000m2.
  • Road base 30,000m3.
  • Asphalt works 17,500 Ton.

Northern Beirut Entrance­ Charles Helou

Screenshot 2025-02-24 at 12.20.37 AM

Project Description

Client: Council for Development and Reconstruction (CDR)
Location: Beirut
Value: $8,971,076.22

Performed Works

  • Earthworks 38,000m3,
  • Granular subbase 7600m3
  • Asphalt works 41,000Ton
  • Concrete works 1100m3 and reinforcing steel to 800Ton.
  • Tiling 24000m2
  • Reinforced soil walls structure
  • Expansion joints: Replacement 7 20lm
  • Movement rang 80mm
  • Reflective studs 2600pcs
  • Construction of a storm water drain age network
  • Safety barriers 2800lm
  • Guard rails
  • Curbstones 18,000lm
  • Road marking 3750m2
  • Traffic safety
Screenshot 2025-02-24 at 12.42.21 AM

Adma Interchange

AM_Profile_Lebanon12

Project Description

Client: Council for Development and Reconstruction (CDR)
Location: Adma
Value: $2,640,529.76

The works comprised:

  • Excavations 2,540m3.
  • Filling 3,120m3.
  • Concreting 6,200m3.
  • Reinforcement works 713 Ton.
  • Waterproofing.
  • Asphalt work and bridge-deck transition.
  • Street lighting.
  • Reinstatement of high voltage cables.
  • Culverts.
  • Landscaping works.

Retaining Walls Foundations

Prime Coat Prior To Asphalt Binder Course Paving

Screenshot 2025-02-24 at 12.15.56 AM

Retaining Wall

Screenshot 2025-02-24 at 12.16.54 AM

Prime Coat Prior To Asphalt Binder Course Paving

Kfarhata Qarabach Bypass

Screenshot 2025-02-23 at 11.53.33 PM

Project Description

Client: Ministry of Public Work
Location: Zgharta North Lebanon
Value: $2,642,691.66

The works for the Bypass Road under Phase 1 include the construction of 1,200m length of two-way city road. The roadways section consists of a 7m wide pavement with a 0.25m verge from each side and 1.50m sidewalk on one side.

The extent of the works includes the following main elements:

  • Site and geotechnical investigation (existing utilities, boreholes at bridges and retaining walls locations).
  • Earthworks for road construction, road widening, drainage channels, culverts, bridges, walls (approximately 34,000m3).
  • Sub-base and base course layers (4338m3)
  • Two asphalt pavement layer involving both new pavement and rehabilitation of existing pavement (2,218 Ton)
  • Construction of approximately 2000m length of retaining walls, 1 bridge, 1200lm. of concrete ditches for Storm water drainage network (7,810m3 of reinforced concrete with 822 Ton of steel reinforcement)
  • Road accessories: sidewalks, signing and marking.
Screenshot 2025-02-24 at 12.02.11 AM

Before

Screenshot 2025-02-24 at 12.03.01 AM

After

Tabarja Dora Highway & Repair Of Ghazir Bridge

AM_Profile_Lebanon11

Project Description

Client: Council for Development and Reconstruction (CDR)
Location: Beirut
Value: $24,473,278.05

Rehabilitation of 20 km length highway average width of 24m along with execution of different infrastructure utilities

  • Storm water.
  • New Jersey barrier, guardrail.
  • Retaining walls.
  • Base course.
  • Bituminous layers.
  • Road marking.
  • Sidewalks.

Bridge Repair:

  • Bridge expansion joints and lifting of Ghazir in order to change elastomeric pads bearing.
  • Flat jacks to lift the 5000T structure.
  • Replacement of elastomeric bearings – 36 Nos.
  • Repair works and injection for cracks and deteriorated concrete.
  • Application for anti-carbonation paint.