
Project Description
Client: Council for Development and Reconstruction (CDR)
Location: Beirut
Value: $24,473,278.05
Rehabilitation of 20 km length highway average width of 24m along with execution of different infrastructure utilities
- Storm water.
- New Jersey barrier, guardrail.
- Retaining walls.
- Base course.
- Bituminous layers.
- Road marking.
- Sidewalks.
Bridge Repair:
- Bridge expansion joints and lifting of Ghazir in order to change elastomeric pads bearing.
- Flat jacks to lift the 5000T structure.
- Replacement of elastomeric bearings – 36 Nos.
- Repair works and injection for cracks and deteriorated concrete.
- Application for anti-carbonation paint.