Reinstatement of Car Parking Area – Ramada Hotel Extension

Project Description

Client: Al Jaber Trading & Contracting
Location: C-Ring Road, Doha
Year Completed: Not Provided
Value: $372,107.14

Reconstruction and rehabilitation of a car parking area for the Ramada Hotel Extension, including road works, drainage, service ducts, and utility installations.

The Challenges

Balancing effective parking design with the constraints of existing urban infrastructure.

Construction and Upgrade of Rayyan Road

AM_Profile_Qatar43

Project Description

Client: Dogus Construction – Onus JV
Location: Al Rayyan
Year Completed: Not Provided
Value: $65,801,750

Supply and laying of asphalt mix and road marking works for Rayyan Road, including temporary traffic diversion and multiple asphalt and sub-base layers.

The Challenges

Minimizing traffic disruption during the upgrade while ensuring durable pavement quality.

Project 7 Contract 2 West of Olympic R/A to West of New Rayyan R/A – Temporary Traffic Diversion and Permanent Asphalt Works

  • Asphalt Wearing Course (40mm) 7,868 Tons
  • Asphalt Wearing Course (50mm) 807 Tons
  • Asphalt Base Course (10mm) 1974 Tons
  • Granular Sub-base (150mm) Laying and Compaction 31,083 Tons
  • Supply and Apply of Tack Coat 30 Tons
  • Supply and Apply of Prime Coat 58 Tons

Construction of Parking in Various Areas of Doha

AM_Profile_Qatar44

Project Description

Client: Public Works Authority (Ashghal)
Location: Greater Doha
Year Completed: Not Provided
Value: $9,567,431.04

Construction of temporary and permanent parking facilities including site clearance, earthworks, pavement construction, kerbing, traffic signage, and installation of drainage and street lighting.

The Challenges

Designing flexible parking solutions while integrating with existing urban infrastructure.

The project works located in various part of Doha within the boundary of Qatar Zones 1 to 68 of Doha Municipality.

Works comprise of the construction of the temporary/ permanent car parking along with the provision of utility services including surface water drainage and street lighting works. The work consists of Site Clearance, Earthworks, Sub-base, pavement construction, Kerbing works, Traffic Signs, road Markings, street lighting, surface water drainage, provision of ducts, ITS (intelligent Transportation System), micro-tunneling and provision of ducts.

Maintenance and Improvement of Roads

AM_Profile_Qatar48

Project Description

Client: Public Works Authority (Ashghal)
Location: Throughout Qatar
Year Completed: Not Provided
Value: $19,066,235.16

Comprehensive reconstruction, rehabilitation, and maintenance of road networks – including drainage, service ducts, earthworks, sub-base and road base improvements, flexible surfacing, kerbing, and traffic signage.

The Challenges

Coordinating large-scale maintenance across diverse regions while ensuring road safety.

The works generally comprise of the reconstruction, rehabilitation and maintenance of general nature to ensure safe movement of vehicular and pedestrian traffic on all roads throughout the state of Qatar.

The scope of works includes Maintenance of traffic detours, Earthworks, site clearance, drainage works, service ducts, sub-base and road base, flexible surfacing, kerbs and footways, traffic signs, road marking, water works, electricity works, Q-Tel, Street Lighting and traffic signals.

Improvement of Roads Surrounding ISF Camp

AM_Profile_Qatar52

Project Description

Client: Public Works Authority (Ashghal)
Location: Duhail Zone 30
Year Completed: Not Provided
Value: $51,609,186.26

Construction of dual carriageways, service roads, and parking facilities around ISF Camp with comprehensive works including earthworks, sub-base, pavement construction, kerbing, and ITS network installation.

The Challenges

Working within a sensitive camp environment while adhering to strict safety protocols.

This Project includes the construction of dual carriageway roads, service roads & parking

The work consists of Site Clearance, Earthworks, Sub-base, pavement construction, Kerbing works, Traffic Signs, traffic signals, road Markings, street lighting, storm water drainage, provision of ducts, ITS (intelligent Transportation System),

  • Earthworks: 132,000 Tons
  • Sub-base & Road Base: 100,881 Tons
  • Flexible Surfacing: 179,265 Tons
  • Kerbs: 82,125m2
  • Interlocks:208,000m2
  • Traffic Signs & Road Marking: 798 Nos.
  • Streetlighting
  • ITS Network
  • Interceptor Sewer Micro tunneling Pipe Jacking: 2,772m2

New Orbital Highway and Truck Route

AM_Profile_Qatar55

Project Description

Client: Habtoor Leighton – Al Jaber Engineering JV
Location: Orbital Highway: Mesaieed to Salwa Road
Year Completed: Not Provided
Value: $309,616,052.72

Design, supply, installation, and commissioning of two asphalt batching plants; supply and laying of asphalt; and application of prime and tack coats, with temporary traffic and road marking works.

The Challenges

Integrating new batching plant installations into an active highway construction zone while maintaining traffic diversion.

Design, supply, installation and commissioning of two asphalt batching plant. Supply and lay of asphalt. Supply and application of prime coat and tack coat. Road works for temporary traffic and road marking works

  • Base Course without PMB 2,001,493 Tons
  • Wearing Course 550,355 Tons
  • Sub-base Course 3,714,022 Tons
  • Binder Course 736,814 Tons
  • Bituminous Coat 4,597 Tons
  • Bedding 105,202 Tons
  • Road Works for Temporary Traffic 56,355 Tons

Development of Al Maadeed Street & Surrounding Roads

AM_Profile_Qatar61

Project Description

Client: Public Works Authority (Ashghal)
Location: Zones 52-55, Al Rayyan Municipality
Year Completed: Not Provided
Value: $66,821,917.81

Development of Al Maadeed and Al Erbayyat Streets into a 5 km dual carriageway featuring four signalized junctions, a 1.5 km service road, and designated parking bays.

The Challenges

Coordinating extensive road widening and junction upgrades in a densely populated area.

The Project works comprise development of Al Maadeed Street & Al Erbayyat Street approx. 5.0Km two lane dual carriageway including 4 Nos. Signalized Junctions and 1.5Km service road and parking bay.

The works consists of but not limited to the following:

  • Site Clearance
  • Earthworks
  • Pavement Layers
  • Kerbing & Footways
  • Traffic Signs & Road Marking
  • Safety Barriers
  • Traffic Signals
  • Intelligent Transportation System
  • Street Lighting
  • Foul Sewerage & Surface Water Drainage
  • Utility Works (Ducts & Protection)

Road Improvement in Al Furousiya Street

AM_Profile_Qatar65

Project Description

Client: Public Works Authority (Ashghal)
Location: Doha
Year Completed: Not Provided
Value: $66,821,917.81

Upgrading of Al Furousiya Street through comprehensive urban improvements including site clearance, drainage, earthworks, pavement construction, paving blocks, kerbing, traffic signage, road markings, street lighting, and ITS-enabled traffic signals.

The Challenges

Managing complex urban upgrades and minimizing traffic disruption during construction.

The Project is upgrading of the Al Furousiya Street 4 lanes including construction, and the work comprises of Site Clearance, Storm water drainage system, TSE, Earthworks, Pavement construction, Paving Blocks & Kerbing works, Traffic signs and road markings, Street lighting, Traffic signals, ITS, Landscaping & Irrigation, Utility works including protection and road crossing ducts (KAHRAMAA Electricity, Water, Ooredoo, QAF, etc.)

Access Roads to Al Wakra Central Market

AM_Profile_Qatar69

Project Description

Client: Public Works Authority (Ashghal)
Location: Al Wakra
Year Completed: Not Provided
Value: $55,794,812.60

Fast-track construction of access roads to the Al Wakra Central Market, including cast in situ reinforced concrete trough approaches at both ends of an existing tunnel underpass.

The Challenges

Accelerated construction scheduling and ensuring structural integrity of tunnel underpass approaches.

The project involves the fast track construction of Access Roads to Al Wakra Central Market (DS136-P7) including the construction of cast in situ reinforced concrete trough approaches to both ends of an existing tunnel underpass.

  • General Items
  • Demolition and Site Clearance
  • Earthworks
  • Unbound Pavement Materials
  • Asphalt Works
  • Kerbs, Footways and Paved
  • Areas
  • Traffic Signs, Markings and
  • Studs
  • Street Lighting
  • Road Structure
  • Water Works
  • Electricity Works
  • Ooredoo Works
  • Road Drainage
  • Treated Sewerage Effluent

RIW for Junctions & Roundabouts in Various Areas of Greater Doha Phase-7

AM_Profile_Qatar73

Project Description

Client: Public Works Authority (Ashghal)
Location: Doha, Zones 1 to 68
Year Completed: Not Provided
Value: $37,521,358.90

Conversion of various roundabouts and junctions into signalized intersections, including utility protection, replacement and installation of traffic signals, as well as landscaping, irrigation, water, electricity, and telecommunication works.

The Challenges

Managing multiple utility interfaces and ensuring minimal disruption during signal replacement.

Conversion of various existing roundabouts / junctions into signalized junctions, protection of existing utilities, inspection of existing traffic signals equipment, liaison with the Utility Departments, replacement of provision, installation, testing, commissioning and maintenance of traffic signal equipment.

  • Site Clearance
  • Earthworks
  • Sub-base
  • Flexible Surfacing
  • Kerbing & Footways
  • Traffic Signs & Road MarkingTraffic
  • Signals
  • ITS works
  • Road Lighting
  • Surface Water Drainage Landscaping
  • Landscaping & Irrigation Works
  • Water Works
  • Electricity Works
  • Ooredoo Works