Project Description
Client: Ministry Of Public Works
Location: Beirut – Lebanon
Value: $17,700,050
The project consists of strengthening of Ministry of justice and palace of justice for seismic reason.
- Execution of 1000 micro piles diameter 30cm under the building depth 16.5-lm the work was executed in very difficult conditions because we kept the facility operational and the basement height is 2.2m.
- Steel construction floors area 6,000 m2.
- Replacement of 10 old elevators with new.
- Enlargement of existing footing in order to transfer load properly to the piles.
- Execution of slab on grade thickness 30cm to assure well connection of all footing.
- Execution of jackets to enlarge existing walls and columns.
- Execution of new shear walls and columns.
- The building was cut and separated transversally in order to execute two new expansion joints width 10cm for seismic movement.
- Execution of a totally new fifth floor of steel structure area
All related finishing works:
– Execution of epoxy flooring for parking
– Installation of selected type of marbles for walls and columns
– Ceramic tiles for toilets
– Parquet for offices
– Painting
– False ceiling
– Electrical
– HV/AC
– Wooden doors and panels for walls
– Aluminum for door sand windows
– Plumbing
The whole project area is 60 000m2, steel quantity
is 2500-Ton and concrete quantity is 20,000m